JBOBS
Home → Case Studies

Problem. Solution. Result.

Six programs that shipped, told the way a buyer reads them: what was broken, what we changed on the floor, and the number at the end.

Alvi's Kitchen & Catering — storefront signage and slat screens
Signage & Architectural

Alvi's Kitchen & Catering — storefront signage and slat screens

Problem — A new dine-in location needed a storefront that read clearly from the parking lot and an interior that felt finished, not fitted-out — with signage, facade cladding and interior screens all landing on one install date.

Solution — We cut the dimensional logo lettering for the entrance glass, then CNC-routed the vertical slat cladding for the facade and the lattice screens that divide the dining room and back the booth run — all sized off the site drawings so the slat spacing carries from outside to inside.

Result — Signage and millwork came off one shop floor on one schedule, so the slat rhythm matches across the facade and the interior partitions instead of drifting between two suppliers.

Full fit-out
Signage + slat screens
Wood + acrylic
Materials fabricated
National sales awards — 1,400 units, 38 destinations
Corporate Awards

National sales awards — 1,400 units, 38 destinations

Problem — The prior supplier engraved from a spreadsheet with no proof step. Twenty-two names came back wrong and the recognition dinner was in nine days.

Solution — We rebuilt the name file with a validation pass, laser-engraved variable data in one run, then kitted by region with a count sheet in every crate.

Result — Zero engraving errors, delivered three days before the event, and the same file now drives the annual reorder.

1,400
Units engraved
0
Reprints needed
Trade-show display prototype in 72 hours
Custom Acrylic Fabrication

Trade-show display prototype in 72 hours

Problem — A brand needed a working counter display prototype before a trade show pitch, with three days on the clock and the file still in revision.

Solution — We cut, formed and UV-printed a full prototype the same day it landed, then turned two rounds of redlines before the show.

Result — Approved on the second revision, in hand before the flight, and the production order followed the next week.

72 hrs
Concept to prototype
2
Revisions included
620-store end cap rollout
Retail & POP

620-store end cap rollout

Problem — The previous display needed two people, a drill and 20 minutes. Store compliance sat at 61% and freight ate the promo budget.

Solution — Value-engineered four SKUs into two, moved to a folded steel spine with tool-free clips, and packed flat two units per carton.

Result — Install under six minutes by one person, freight cost down 22%, compliance at 96% in week one.

96%
Store compliance
-22%
Freight cost
Service anniversary program, 11 tiers
Corporate Awards

Service anniversary program, 11 tiers

Problem — HR was buying eleven award tiers from four vendors, so finishes did not match and the five-year piece looked cheaper than the one-year.

Solution — One material family across all tiers — brushed aluminium on cast acrylic — with a tier-coded engraving depth and a single stocked reorder SKU list.

Result — Consolidated to one PO, unit cost down 14%, and tiers now read as one family on a shelf.

11
Tiers unified
-14%
Unit cost
Museum exhibit cases, edge-polished to invisible seams
Custom Acrylic Fabrication

Museum exhibit cases, edge-polished to invisible seams

Problem — A touring exhibit needed six matched display cases with seams that would not show under gallery lighting, on a fixed install date.

Solution — Solvent-welded corners, diamond-polished every edge, and each case crated individually to survive the freight route.

Result — All six cases passed inspection on-site with zero visible seams, and the exhibit opened on schedule.

6
Cases delivered
0
Visible seams
Have a similar job?

Tell us the problem. We'll tell you how we'd build it.

Send a drawing, a photo of the failed part, or just a description of what's not working. Quotes come back in one business day.

Call Now Request a Quote